Section 3: Scale Installation
A. Introduction
Installation consists of the following:
•
Foundation check, layout, and mounting assembly installation
•
Tools, materials, documentation, and a lifting mechanism (crane or hydraulic jack)
•
Installation of the mounting assemblies
•
Installation of the rocker column load cells
B. Preparation for installation
1.
Tools, equipment, and materials required:
a.
Hydraulic jacks -- Use hydraulic jacks that have sufficient capacity plus (+)
a safety factor for the size of the vessels you are installing the Omnicells.
b.
Blocking material to support lifted vessel.
c.
Determination of how the scale system will be calibrated.
•
Calibration weights (Only application method for NTEP system)
i.
Get calibration weights on site
ii.
Dolly, or other method, for moving weights
iii.
Means for lifting calibration weights (chains, Come-Along winch, etc.)
iv.
Lifting point on vessel for supporting calibration weights
•
Substitution – Product measured by other device (scale, flow meter,
etc.) then used as the calibration weight.
i.
Schedule product to arrive when needed
ii.
Determine how product will be put into, and removed, from vessel
•
MilliVolt calibration with Intalogix Technology
i.
Check to make sure the correct equipment was ordered (Q
Series instrument and Quad Multiplexer Board or Flash
Instrument, Smart Sectional Controller and Pit Power Supply)
ii.
Load cell calibration sheets
d.
Determination of how the scale system will be installed.
•
Welded
iii.
Arc Welding Machine
iv.
Welding Rod
v.
Steel Brush
vi.
Grinder
vii.
Chipping hammer