beautypg.com

Pals, continued – Fairbanks MATRIX SCALE HIGHWAY SCALE SYSTEM User Manual

Page 8

background image

Section 1: General Information

11/12

8

51182 Rev. 2

PALS, Continued

• Load Cells are preinstalled, plumbed

and pre-wired to the Junction Box prior
to shipping.

• Junction Boxes are installed at the

factory.

The Dip Switches are not set.

Interconnecting Cables are not
installed
.

• End and Side Checking is also pre-set

at the factory according to
manufacturer’s specification.

• Tie-down Bolts are installed at the

factory for shipping.

Load Cells are preinstalled and
pre-wired, located under the plate

Tie Down Bolt End Checking Side Checking

Factory-set Checking