Installation – Fulton Electric (FB-L) Steam Boiler User Manual
Page 15

Electric IOM
Installation
11
5
6
4
7
19
300 to 1000 kW (30 to 100 BHP)
Elements are vertically mounted. There
boilers have an externally mounted water
bottle assembly housing the low water cut-
off probe, pump on and pump off probe.
The second (auxiliary) low water cut-off
probe is mounted in the top of the boiler.
Component Locations of the Fulton 12 to 1000 kW
(1.2 to 100BHP) Steam Boilers