Installation – Poweramp POWERHOOK SERIES User Manual
Page 18

INSTALLATION
Powerhook Ks6 and Ks7 Installation instructions.
Additional installation procedures not given in this manual may be required. See the CENTRAPOWER manual for
more information.
Preparation
1. Some units are shipped with the control assembly, bumpers and outside light assembly attached to the unit.
Remove these items from unit prior to installing unit in pit. DO NOT remove the shipping bands at this time.
2. Remove all debris from the pit.
3. Check the pit dimensions with the certified pit drawing attached to this manual. Make sure that the walls of the
pit are plumb and square with no bulges. Check dock height, location of imbed plates, and J-box.
Installing unit in pit
4. Place the shims for the front and rear of the leveler on the imbed plates in the pit floor. Position the shims so
that the legs will rest firmly on the shims when the unit is lowered into the pit. Shim so that dimension from top
of shims to dock floor is as shown. Recommended shim stock sizes see Figure 8
5. Install the leveler into the pit with the lifting brackets on the side of the platform. Perform the following checks
before setting leveler into pit.
A. Make sure the front and rear legs will rest securely on the shims set on the pit floor.
B. Make sure the top rear frame angle of the dock leveler is tight against the rear curb angle and flush with
the dock floor.
C. Make sure there is equal clearance between the sides of the leveler platform and the pit walls.
6. Remove the shipping bands from the unit.
7. Use fork truck (or other method) to raise dock leveler platform.
8. Position shims under the hinge tubes of the maintenance prop so that the front panel support weldment is
level. Recommended shim stock sizes see Figure 8
4111-0010 — Nov 2010
16
Imbed Plate
Rear Imbed
Shim as Required
Electrical J-Box
43-1/4
43-3/4
Rear Imbed
43-1/4
43-3/4
Imbed Plate
Shim as Required
Electical J-Box