4 restarting the aml/j system – ADIC Switches User Manual
Page 34
![background image](/manuals/34032/34/background.png)
4-6
Operation
DOC D00 025-A
Step 1
Actuate the main switch
The power voltage of the AML/J is switched off. All movements of the
robot are stopped.
4.4
Restarting the AML/J system
The AML/J system is restarted as follows after an emergency shutdown.
Step 1
Rectify all problems which made stopping the AML/J system
necessary (if required).
Step 2
Start the AML/J system according to the procedure Starting the
AML/J system on page 4-3.