Anchor Industries NAVI-TRAC NAV40GBL-1104 User Manual
Page 2

TABLE OF CONTENTS
Page No.
Assembly Step
3
Introduction with Frame Terminology Illustration
4
Component Illustrations
5
40’ Navi-Trac Component List Table
6
40’ Navi-Trac Component List Table Cont’d
7
Safety Guidelines
8
Squaring the Tent Footprint Layout and Diagonals Chart
9
Assembling the first Beam
Assembly Layout of all Beams (Butterflying First Two Beams)
10
Erecting the First Beam and Stabilizing the First Beam
Erecting the Second Beam
11
Connecting the First Two Beams
Installing Purlins
Completing First Bay
12
Completing the Top Frame
Installing the Gabled End Frame
Guying Out the Completed Frame
13
Installing the Mid Panels and Gabled End Panels
Tensioning Fabric Panels
14
Completing the Gabled End Unit
Alternate Hip End/ Gabled End Configuration
15
Combining Hip and Gabled End Assembly Steps
Component Changes for Hip/ Gabled End Configuration
16
Limits of Liability
2