beautypg.com

Maintenance and care – Minuteman E28_E30_E33 (7062.12_.15_.18) User Manual

Page 24

background image

24

Maintenance and Care

5.3

Maintenance Schedule

System Maintenance Customer
The daily and weekly maintenance in-
tervals must be performed by the custo-
mer/operator.

To be performed

Interval

daily

weekly

Fill solution tank and proceed to chemical agent dosage

o

Charge batteries

o

Check brush head and clean if required

o

Check squeegee and clean if required

o

Clean tank lid seal of the recovery tank

o

Empty recovery tank. Clean recovery tank and suction filter

o

Check brushes/pads and replace if required

o

Clean suction hose of recovery tank

o

Check squeegee sealing strips and turn around or replace if required

o

Clean drain hose of solution tank

o

Check solution supply to brushes and clean if required

o

Check solution filter and clean if required

o

Test drive and function test

o