3 check for operational readiness – ADS-TEC VMT6010/6012/6015 User Manual
Page 15

VMT6010/6012/6015
14
© ads‐tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden‐Echterdingen
Abb. 6:
Warning:
The indicated protection class is only fully guaranteed if the case cover is correctly
installed!
Pos: 19 /Datentechnik/Inbetriebnahme/Betriebsbereitschaft prüfen/Betriebsbereitschaft prüfen für OPC/CPC/PLC/OTC/ITC/VMT-Serie(+Monitore) / IPC 5100/5500/2400/1100 @ 0\mod_1158905578361_6.doc @ 381 @
4.3 Check for operational Readiness
Check the device for any hidden damage potentially caused by improper transport, operating or storage
conditions or by improper use or handling (e.g. smoke development from the device, etc.). If any damage is
detected, the device must be put out of service immediately and protected from accidental switch‐on.