Controlled Products Systems Group 4300SW User Manual
Page 3

1
CAUTIONS AND NOTES
2
EXTREMELY IMPORTANT
2
ETL DEFINITIONS COMPLIANT TO UL325
2
1 - OVERVIEW
2
1.1 - Gate controller
2
1.2 - Main control board
2
1.3 - ,@HMBNMSQNKAN@QCRODBHjBR
2
2 - GATE INFORMATION
3
2.1 - ASTM F2200
3
2.2 - Gate material
3
2.3 - Gate latches
3
2.4 - 2ODBHjB@OOKHB@SHNMR
3
2.5 - Swing gates
3
2.6 - General requirements
3
3 - SAFETY AND CAUTIONS
4
3.1 - Properly installed safety devices
4
3.2 -
Safety signs, notices to personnel warning signs
4
3.3 - The gate system safety devices
4
3.4 - Infrared beams and warning signs
4
3.5 - Establish the location
4
3.6 - Read and follow all instructions
4
3.7 - Keep children away
4
3.8 - Test the gate system
4
3.9 - Keep gates properly maintained
4
4 - PRE-INSTALLATION NOTES
4
4.1 - Follow Instructions
4
4.2 - Intended usage
4
4.3 - Warnings, cautions and notes
4
5 - SWING OPERATOR CUTAWAY DRAWINGS
6
6 - INSTALLATION PROCEDURES
7
6.1 - Step one-location
7
6.2 - Step two-concrete
7
6.3 - Step three-physical mounting
7
6.4 - Step
four
-manual release
7
6.5 - Step
jUD
-arm assembly
7
6.6 - Learning and programming features
7
6.7 - 'NVSNRDSTOSGDRXRSDLENQjQRSTRD
8
6.8 - The leaning sequence
8
6.9 - Learning mode
8
7 - CIRCUIT BOARD LAYOUT
9
8 - ACCESSORY INPUTS AND OUTPUTS
10
8.1 - Outputs
10
8.2 - Inputs
10
8.3 - Communication bus
10
8.4 - Programming the plug-in receiver and remote controls
11
9 - WIRING AND CONNECTIONS
12
10 - OPTIONAL INPUTS
12
10.1 - Fire input and fail safe connector
12
10.2 - Fail safe connection
12
10.3 - Magnetic lock connection
13
10.4 - Guard station connection
13
10.5 - Exit and edge inputs wiring diagram
13
10.6 - Radio receiver connection (third party)
13
11 - INSPECTION AND OPERATION
14
12 - GENERAL LAYOUT AND SAFETY ACCESS
14
13 - ACCESSORIES AND SENSORS
15
14 - CONTROL BOARD NOMENCLATURE
16
15 - PROGRAMMING BUTTONS
17
15.1 - Force
17
15.2 - Speed
17
15.3 - Acceleration
17
15.4 - Delay
17
15.5 - Function
17
15.6 - Display
18
16 - GATE DIRECTION REVERSAL
18
17 - RE-ASSEMBLING GATE OPERATOR
19
18 - EMERGENCY VEHICLE ACCESS
19
19 - GLOSSARY
19
20 - MAINTENANCE SCHEDULE - APOLLO GATE OPENER
20
21 - INSTALLATION DRAWING (1)
20
22 - INSTALLATION DRAWING (2)
21
23 - TEMPLATE FOR INSTALLATION (3)
22
24 - COM
PACT ARM MEASUREMENTS
23
25 - GATE ARM INSTALLATION
24
26 - MECHANICAL ADJUSTMENT OF GATE CLOSING
POSITION
25
27 - APOLLO
GATE OPENER TROUBLESHOOTING
25
28 - PROGRAMMING QUICKSTART
26
28.1 - Learning the gate
26
28.2 - Gate direction reversal
26
28.3 - Putting the controller into learning mode
26
29 - INSTALLATION CHECKLIST
27
TABLE OF CONTENTS