20 - MAINTENANCE SCHEDULE - APOLLO GATE OPENER

Active the primary (inherent)reverse system by blocking the gate with a solid object. The
gate should reverse momentarily then stop. Restart the gate snd block again with a solid
object. The gate should reverse momentarily, then stop, and go into hard shutdown with
an alarm

If operator is equipped with option DC backup system, check to be sure the system
opens the gate upon loss of AC power

If operator is equipped with option DC backup system, check the batteries for any
leakage or loose connections. Batteries should be replaced every two years

Check emergency vehicle access device for proper operation

Check that the gate reverses on contact with an object in both the opening and closing
cycles

Check vehicular reverse and shadow loops for proper operation

Check manual release for proper operation

Overall Check: Complete check of gate and gate operating system

Check screws and nuts

Remove top lid and sweep out any debris or dust that may have accumulated.

Every 6 months

Alarm

Backup System

Battery

Fire Dept

Reverse System

Loop(s)

Release

Complete

Mounting Hardware

Rain Drain

COMPLETE

BASIC

Table 2

Figure 29 - INSTALLATION DRAWING

21 - INSTALLATION DRAWING (1)

Gate Arm Attachment

Sample installation

14”

24”

10”

20”

39”

33

1/2”

24”

POST

POST

LONG ARM

SHORT ARM