Section 3 installation, 1 unpacking the instruments, 2 operating environment – Hach-Lange BIOGAS User Manual User Manual
Page 8
8
Section 3
Installation
3.1
Unpacking the instruments
The BIOGAS Titration Manager comes packaged with the following items:
•
BIOGAS Titration Manager, one burette, zero version
•
B525, Burette Stand, 25 mL, red cover with connection tubing
•
Accessories for Titration Manager burette stand
•
Set of Cables for Tiration Workstation (w/o serial PC Printer cable)
•
Cell kit
•
Titration Vessel, PP, 40-100 mL (pack of 10 pcs of 956-265)
•
Titration Vessel, PP, 22-45 mL (pack of 10 pcs of 956-178)
•
User Manual BIOGAS
•
Basic User Manual BIOGAS, multilingual
•
Method Guide for FOS/TAC (organic acids (FOS) and total inorganic carbon (TAC)), En-Ger
•
Installation form (Fr-Eng-Ger)
Note: If any of these items are missing or damaged, contact the manufacturer or a sales
representative immediatly.
3.2
Operating environment
The following conditions are necessary to ensure correct instrument operation and accurate results:
•
Place the instrument firmly on an even surface. Do not push any objects under the instrument.
•
Maintain an ambient temperature of 5 to 40 ºC (41 to 104 ºF) for proper instrument operation.
•
The relative humidity should be less than 80 %; moisture should not condense on the
instrument.
•
Leave at least a 15 cm (6 in.) clearance at all sides for air circulation to avoid overheating of
electrical parts.
•
Do not operate or store the instrument in extremely dusty, damp or wet locations.
•
Keep the surface of the instrument and all accessories clean and dry at all times. Splashes or
spills on the instrument should be cleaned up immediately.
D A N G E R
Only qualified personnel should conduct the tasks described in this section of the manual.
N O T I C E
Protect the instrument from temperature extremes, including heaters, direct sunlight and other heat sources.