3 eight bottle installation, Figure 9, Installation – Hach-Lange Sigma SD900 Portable User Manual
Page 25

23
Installation
4. To keep samples cool, fill the sampler base with ice after the
bottles are in place.
Note: The time that it takes the ice to melt varies with the amount of
ice used, the external temperature and sample temperature.
5. Place the midsection over the base, program the sampler and
install in the field.
3.3.3.3 Eight bottle installation
Use 8 bottles to collect samples into one-liter or two-liter bottles.
Prerequisites:
•
8 plastic or glass bottles
•
Retainer (see
for catalog number)
Note: Refer to
to make sure that the correct sample
bottles are used with the correct sampler base and retainer.
Installation procedure:
1. Clean the sample bottles as described in
.
2. Place the bottles in the base (see
Figure 8 on page 22
):
•
Compact base first bottle position: under the arrow label.
•
Standard base first bottle position: under the 8 BOT label.
3. Place the retainer over the bottles with the knobs pointing up.
Secure with the straps.
Note: The retainer for the compact base has two pieces. Place the
larger piece in the bottom of the base.
Figure 9 Two and four bottle installation
1
Standard sampler base (Cat. No. 8976)
3
Retainer (Cat. No. 2190)
2
1-gallon plastic or glass bottles (2x)
4
1-gallon plastic or glass bottles (4x)