Stage 2 - wiring & electrical, 1 - fitting the control panel in the casing, Screws screw positioning holes – CAME Frog-AES24 Kit User Manual
Page 9: Green connector point fastening screws
STAGE 2 - WIRING & ELECTRICAL
2.1 - Fitting the Control Panel in the Casing
8
Screws
Screw positioning holes
Green connector point
Fastening screws
Securely fasten the control panel PCB to the
casing with the screws supplied.
Plug the green connector from the transformer to
the PCB ensuring that it connects the correct way.
NB FROG Series Motors: connect the black wires
coming out of the board to one capacitor.
This manual is related to the following products: