beautypg.com

Filling the system, 3 filling the system – DE DIETRICH INNOVENS PRO MCA 45 - 65 - 90 - 115 User Manual

Page 37

background image

4

Carry out a visual check for the presence of any water leaks.

4

Open and close the radiator valves several times a year (this

prevents the valves from seizing up).

4

Clean the outside of the boiler using a damp cloth and a light

detergent.

CAUTION

Only a qualified professional is authorised to clean the

inside of the boiler.

6.3

Filling the system

1. Check the water pressure in the installation shown on the control

panel display.

If the water pressure is lower than 0,8 bar, more water

should be added. If necessary, top up the water level in the

heating system (recommended hydraulic pressure

between 1,5 and 2,0 bar).

2. Open the valves on all radiators connected to the heating system.

3. Set the room thermostat to as low a temperature as possible.

4. Wait until the temperature drops below 40°C and the radiators

seem cold before filling the central heating system.

T001507-B

1

2

3

4

T000181-B

1

2

3

4

T000181-B

T000182-A

T000185-A

MCA 45 - 65 - 90 - 115

6. Checking and maintenance

28/08/12 - 300024828-001-01

36