beautypg.com

Schreiber Chillers ASM010_Rev_C User Manual

Page 9

background image

Page 5

ASM010 Manual

Revised 6.22.2004

Technical

Please note that Schreiber Engineering is not responsible for any code compliance of
this equipment and installation. End user must insure that operation of this module
will not violate any local plumbing or environmental codes.

The end users must also be responsible for providing a pressurized water line and drain to
the unit, and that water supply line will deliver the flow, pressure, and temperature
required by the load. Schreiber Engineering is not responsible for failure of the load due
to inadequate back up water supply.

In the case of switching over from chiller to city water, a significant amount of chilled
water, stored between the panel and the load, will be drained. The end user must ensure
that fluid being used is compliant with city code, and the chiller is refilled to the proper
level marked on sight glass.


Operation


Figure 3: Plumbing Schematic