beautypg.com

Q.V.P. EP10 - Continuous Flow Veneering User Manual

Quality vakuum products, inc, Ep10 industrial manual set-up diagram

background image

Quality VAKuum Products, Inc.

Or visit our site at

www.qualityvak.com

CALL 1-800-547-5484 TODAY!

EP10 INDUSTRIAL MANUAL SET-UP DIAGRAM

(continuos flow)

MANUAL VAKUUM BAG OR FRAME PRESS VENEERING

4/7/98 - EP10 Manual VB&FP Veneering.cdr

Filter

Electric Pump

Foot Pedal
(Optional)

1/2“ I.D.
Tubing

Electric
Outlet

VAKuum Bag

or

Frame Press

VCA6

Gauge

1.)

Screw the filter/gauge assembly onto the Electric Pump.
CAUTION:

Do not use the filter as leverage to tighten the

assembly, as it may break. Use a wrench on the brass fittings to
tighten the assembly.

2.)

3.)

Attach the long clear piece of tubing from the filter/gauge assembly to
the VCA6 (VAKuum Connector Assembly) on the VAKuum Bag or
VAKuum Frame Press. Refer to Instructions for Assembling the
VAKuum Bag
for details.

4.)

If you are using an optional Foot Pedal connect the pump to the pedal
and the pedal to the electric outlet. The pedal is an On/Off switch for
the pump.

Attach the long piece of hose to the barb on the filter/gauge assembly.

S

Remove orange plastic plug and screw in filter assembly.

74 Apsley St. - Hudson, MA 01749
Tel: 978-562-4680 - Fax: 978-562-4681