beautypg.com

Q.V.P. EP5 - Manual vacuum presses Veneering User Manual

Quality vakuum products, inc, Ep5 super-pro manual set-up diagram, Manual vakuum bag or frame press veneering

background image

EP5 SUPER-PRO MANUAL SET-UP DIAGRAM

MANUAL VAKUUM BAG OR FRAME PRESS VENEERING

1.)

Screw the filter/gauge assembly onto the Electric Pump.
CAUTION:

Do not use the filter as leverage to tighten the

assembly, as it may break. Use a wrench on the brass fittings to
tighten the assembly.

2.)

3.)

Attach the long clear piece of tubing from the manifold/gauge
assembly to the VCA6 (VAKuum Connector Assembly) on the bag
or press. Refer to Instructions for Assembling the VAKuum Bag for
details.

4.)

If you are using an optional Foot Pedal connect the pump to the pedal
and the pedal to the electric outlet. The pedal is an On/Off switch for
the pump.

Attach the 1’ long piece of tubing with the check valve and
manifold/gauge assembly to the pump. The end with the check valve
should be closest to the pump and the red end of the check valve
should point towards the VAKuum Bag or Frame Press.

Filter

Electric Pump

Foot Pedal
(Optional)

4/1/98 - EP5 Manual VB&FP Veneering.cdr

Gauge

Check Valve

(Red end towards Bag/FP)

Quality VAKuum Products, Inc.

Or visit our site at

www.qualityvak.com

CALL 1-800-547-5484 TODAY!

Manifold &

Gauge

1/2“ I.D.
Tubing

Electric
Outlet

VAKuum Bag

or

Frame Press

VCA6

P

Remove orange plastic plug and screw in filter assembly.

74 Apsley St. - Hudson, MA 01749
Tel: 978-562-4680 - Fax: 978-562-4681