Atec Fluke-DSX-5000 User Manual
Page 3

Project Menu screen shows percent
complete per job
Project specific screen shows up to the
minute project details
ProjX Management System Manages Complex Jobs with Ease
Manage up to 12,000 test results with full graphics
Managing the testing of multiple jobs with multiple teams, testers, and requirements is time consuming and can be hard to manage. Increasingly
larger jobs make project organization more important than ever. The new ProjX management system on the DSX- 5000 provides individual
project files for all job specific details to be saved under a simple name. Eliminating the need to re-enter job specific details after starting a
project. This minimizes set-up errors or lost files when switching from one job to another or utilizing multiple testers on a single job. In addition, it
provides test results by cable ID, merges any changes without duplicates and always defaults to the last copper or fiber module installed. ProjX
management system provides real time status to completion on each job with a 0-100% scale and gives the operator the option to isolate any test
requiring a second look and helps to assure nothing is overlooked. The "Fix Later" selection creates a punch list or automatic to do list for
correcting any workmanship. ProjX enables project managers and crew leaders to be truly efficient.
Taptive User Interface Simplifies Set Up, Eliminates Errors and Speeds Troubleshooting
Capacitive touchscreen allows quick tester setup and supports all standards
Taptive user interface is easy enough for even the newest technician to perform tests across multiple media types and testing requirements. The
capacitive Taptive user interface makes all jobs easily accessible from the menu screen. Touch the job you’re working on and the large display
confirms the test that needs to be performed, animated instructions simplify setting the tester configuration making correct testing assured.
Simple Set up
3 of 8