Nominal Rating: 100 kW at 480 and 240 Volts AC, 3 Phase, 60 Hertz, 120/241 Amps per Phase
Total load de-rates to 75 kW when operated at 208 Volts AC, 3 Phase, 60 Hertz
, 208 Amps/ph.
Other ratings: 50kW@240-1=208A, 38kW@208-1=181A, & 25kW@120-1 = 208A
Tolerance: +5% (105 kW at 480 & 240 VAC 3 ph. & 79 kW at 208 VAC 3 ph.)
Duty Cycle:
Nominal Load Step Resolution:
12.5 kW at 480 Volts AC 3 phase
6 or 12.5 kW at 240 Volts AC 3 phase*
5 or 10 kW at 208 Volts AC 3 phase*
3.3 or 6.5 kW at 240 Volts AC single phase*
1.6 or 3.3 kW at 240 Volts AC single phase*
* User can select: low resolution, low capacity mode; or high capacity, high resolution mode
Step switches are labeled for each voltage and phase mode
Easy to use operator control panel with:
Latest in digital metering with 3 line LED display
Status indicating lights:
Air-flow indicating red and green lights
Over-temperature red light
Main Power on/off switch
Fan on/off switch
Master Load switch
Voltage Selection switch
Individual load step switches
Test jacks for meter probes A, B, C, & N
Safety Features:
Branch circuit fuse protection on all 3 phases of all load steps. .
Fused 120V control circuit
Air pressure switch to prevent load from being applied if loss of cooling air is detected
Over-temperature sensor automatically removes load if an over-temperature condition is detected
Blower Motor circuit is protected by current overload protection.
Operator warning and caution statements are located on appropriate access panels and doors.
Control Power:
110-120 VAC, 1 Phase, 50/60 Hertz, required for control circuit operation. Line cord provided.
Cooling System:
Integrally mounted, high velocity, low noise, 110-120V AC 1 phase 50/60 Hz. fans provide the
necessary cooling air
for the resistor load elements.
Eagle Eye LB-100-MV-12.5 Portable Resistive Load Bank Specifications
Load Connections: Quick disconnect single pole power connectors.
3 Phase 4 “wye” (A,B,C,N) & 1 Phase 2 Wire for single phase testing.
Rated for continuous generator test operation.