Alpha Technologies CESC User Manual
Page 4

TM
Table of Contents
1. Introduction .......................................................................... 9
2. Installation ......................................................................... 10
2.1
Concrete Pad Preparation ...................................... 10
2.2
Utility Power Connection ....................................... 11
2.3
Generator / Sidecar Inter-connecting Cables ............ 15
2.4
Internal Components ............................................ 16
2.5
Battery Pack Wiring .............................................. 17
2.6
Power Supply Placement ....................................... 18
2.7
Battery Remote Temperature Sensor (RTS) .............. 19
2.8
Service Power Inserter .......................................... 20
4
031-106-C1-001 Rev. A
List of Figures
Fig. 1
Sidecar and generator enclosure ..........................9
Fig. 2
Pad layout ....................................................... 10
Fig. 3
Service Entrance wiring ..................................... 13
Fig. 4
Meter base wiring............................................. 14
Fig. 5
Interconnection wiring ...................................... 15
Fig. 6
Fan connections ............................................... 16
Fig. 7
Location of IPP, SPI, and ground rail................... 16
Fig. 8
36- & 48-volt battery string wiring ..................... 17
Fig. 9
Power supply on shelf ....................................... 18
Fig. 10 Location of temperature sensor ......................... 19
Fig. 11 Seizure screw assembly location ........................ 20
Fig. 12 Cable connection.............................................. 20
Fig. 13 Location of SPI ................................................ 20
List of Tables
Table 2-1
Circuit Breaker Requirements ........................ 11