beautypg.com

Alpha Technologies CESC User Manual

Page 4

background image

TM

Table of Contents

1. Introduction .......................................................................... 9

2. Installation ......................................................................... 10

2.1

Concrete Pad Preparation ...................................... 10

2.2

Utility Power Connection ....................................... 11

2.3

Generator / Sidecar Inter-connecting Cables ............ 15

2.4

Internal Components ............................................ 16

2.5

Battery Pack Wiring .............................................. 17

2.6

Power Supply Placement ....................................... 18

2.7

Battery Remote Temperature Sensor (RTS) .............. 19

2.8

Service Power Inserter .......................................... 20

4

031-106-C1-001 Rev. A

List of Figures

Fig. 1

Sidecar and generator enclosure ..........................9

Fig. 2

Pad layout ....................................................... 10

Fig. 3

Service Entrance wiring ..................................... 13

Fig. 4

Meter base wiring............................................. 14

Fig. 5

Interconnection wiring ...................................... 15

Fig. 6

Fan connections ............................................... 16

Fig. 7

Location of IPP, SPI, and ground rail................... 16

Fig. 8

36- & 48-volt battery string wiring ..................... 17

Fig. 9

Power supply on shelf ....................................... 18

Fig. 10 Location of temperature sensor ......................... 19

Fig. 11 Seizure screw assembly location ........................ 20

Fig. 12 Cable connection.............................................. 20

Fig. 13 Location of SPI ................................................ 20

List of Tables

Table 2-1

Circuit Breaker Requirements ........................ 11