Safety – Alpha Technologies USM2.5 Status Monitor User Manual
Page 6

Safety
6
704-683-B0-004, Rev. D
Cautions
NOTE: Equipment or parts may be damaged or cause damage if used or
installed improperly.
To avoid damage:
•
Prior to installation, verify that the AC input voltage to the enclosure and its equipment
match with respect to voltage and frequency.
•
Prior to installation, verify that the output voltage from the enclosure or its equipment
match the voltage requirements of the connected equipment (load).
•
Prior to installation, verify that the enclosure’s utility service panel is equipped with a
properly rated circuit breaker for use with the equipment inside. Refer to manufacturer’s
recommendations.
•
Review and upgrade utility service panel circuit breaker requirements whenever the
equipment within the enclosure is changed.
•
Prior to installation, contact local utilities, local building maintenance departments, and
cable/piping locator services to ensure that installation does not interfere with existing
utility or building cables/piping.
•
Do not exceed the output rating of equipment. Verify load requirements prior and during
connection process.
•
Prior to handling the batteries, touch a grounded metal object to dissipate any static
charge that may have developed in your body.