Installation – Elmo Rietschle L-BV5 Operating instructions User Manual
Page 17

Installation
© Gardner Denver Deutschland GmbH
17 / 32
610.44440.40.000
5.2.3 Connecting up system components
Connect up the components in accordance
with the flow diagram shown below:
Operation with supply of the operating-liquid,
automatically controlled operation
1
2
3
4
5
6
7
610.44440.99.B09
1 Unit
2 Flow
meter
3 Throttle
valve
4 Solenoid valve coupled to the motor
5 Bypass line with shut-off valve (for initial filling)
6 Strainer
7 Operating-liquid
supply
line
Fig. 8: Operation with supply of the operating-
liquid: automatically controlled operation
Operation with supply of the operating-liquid,
non-automatic control of operation
1
2
3
4
6
7
610.44440.99.B10
1 Unit
2 Flow
meter
3 Throttle
valve
4 Shut-off
valve
6 Strainer
7 Operating-liquid
supply
line
Fig. 9: Operation with supply of the operating-
liquid: non-automatic control of operation
Operation with self-suction of the operating-
liquid
900 mbar abs
13.1 psia
≤ 1 m
≤ 3.28 ft
4
a
b
1
7
9
8
610.44440.99.B11
1 Unit
4 Shut-off
valve
7 Operating-liquid
supply
line
8 Suction
line
9 Operating-liquid storage vessel
a Liquid level necessary on start-up
b Min. liquid level during operation
Fig. 10: Operation with self-suction of the operat-
ing-liquid
5.2.4 Ancillaries
The following ancillaries can be supplied from our
catalogue:
liquid separator including return line and cavi-
tation-protection line
cavitation-protection
valve
check
valve
connection and contra-flanges
gas
ejector
flow
limiter.