beautypg.com

Precautions/pre-installation 3. installation – Liberty Pumps LowPro-Series User Manual

Page 3

background image

©Copyright 2012 Liberty Pumps Inc. All rights reserved 3

TEMPORARY

MANUAL

OPERATION

DO!

DON’T!

Fig. 1 Piggyback plug installation.


1. Inspect all materials for shipping damage and to ensure that all parts have been received. Contact your dealer with any problems

prior to installation.

2. Read all instructions and familiarize yourself with the unit's operation prior to proceeding with the installation. Read pump

specifications to assure pump has adequate head performance prior to installation - See "Note" under pump specifications.

3.

Risk of electric shock. Always disconnect the pump from the power source before handling or making

adjustments. The pump power cord is equipped with a grounding conductor and grounding-type 3-prong plug.

To reduce the risk of electric shock, be certain that the Sumpbox™ unit is connected only to a properly

grounded grounding-type receptacle. This receptacle should be protected by a ground fault circuit interrupter

(GFCI). All electrical circuitry should be installed in accordance with the National Electric Code (NEC) and all

applicable local codes or ordinances. Never remove the ground pin from the plug.
Never remove the ground pin from the plug.

4.

Make certain that the outlet is within reach of the power supply cord.

Never use an extension cord.

5. The power cords from the LowPro system are equipped

with piggyback plugs and must be connected in series to

operate automatically (see fig. 1).

6. Check to ensure that your power source is adequate to

handle the pump amperage. Pump amperage can be

found on the nameplate and/or the product literature.

Ensure that the electrical supply circuit is equipped with

fuses or breakers of the proper capacity.

7. It is recommended that a separate branch circuit be

installed for the pump. Such a branch circuit should be

sized in accordance with the NEC.

8. Each electrical outlet should be tested to ensure that a

proper ground has been established. A UL listed circuit

analyzer will indicate if the power, neutral, and ground wire

are properly connected.

9. A qualified licensed electrician should install and test all electrical circuits.
10. All plumbing (waste and vent) must be installed to meet local plumbing codes.

This unit must be properly vented. Automatic

or mechanical plumbing vent devices must not be used. This pump is not to be installed in a location classified as hazardous

in accordance with the NEC, ANSI/NFPA 70.

11.

Liquid temperature must not exceed 140

F (60

C).


12.

Always disconnect the pump from the power source prior to removing or servicing.


1. The LowPro is shipped factory assembled; inspect tank, pump and accessories for shipping damage. Contact your dealer with any

problems prior to installation

2. The tank installation location must be level. Position the tank in its final location and ensure that it is level. Use hydraulic cement

or similar material for leveling the floor if necessary.

3.

If installing walls or floor joists, use caution to ensure that nails, screws, or other sharp objects do not puncture the tank

when framing.

4. Determine the closest and most readily accessible locations to tie in the discharge and vent lines to existing lines. Take the

necessary measurements and determine what plumbing fittings and pipes are needed.

5. An inlet for a 2" PVC drain line from additional fixtures (i.e. sink or shower) may be installed using the rubber pipe grommet

(supplied). Determine the best location for the drain line to enter the tank making sure it is within the marked textured areas of the

pump chamber. See fig. 2.

Do not drill below or outside of the textured areas. Make sure drain lines have adequate gravity

flow to the system. If a shower is being used, elevate the shower to allow for proper trapping and drainage. Drill a 3" diameter

2. Precautions/Pre-Installation

3. Installation