Alignment – Gorman-Rupp Pumps 810A2-4045T 1529947 and up User Manual
Page 14
OM-06543
80 SERIES
PAGE B - 7
INSTALLATION
DISCHARGE PIPE
DISCHARGE
CHECK VALVE
PUMP DISCHARGE
SELF‐PRIMING
CENTRIFUGAL
PUMP
SUCTION
LINE
SUPPORT
BRACKET
CLEAN‐OUT
COVER
INSTALL AIR RELEASE VALVE
IN HORIZONTAL POSITION
90
_ LONG
RADIUS
ELBOW
WET WELL
OR SUMP
BLEED LINE 1”
(25,4 MM) DIA. MIN.
(CUSTOMER FUR
NISHED) EXTEND 6”
(152 MM) BELOW
PUMP OFF LIQUID
LEVEL
Figure 3. Typical Automatic Air Release Valve Installation
Connect the valve outlet to a bleed line which
slopes back to the wet well or sump. The bleed line
must be the same size as the outlet opening or
larger, depending on which Air Release Valve is be
ing used. If piping is used for the bleed line, avoid
the use of elbows whenever possible.
NOTE
For multiple pump installations, it is recommended
that each Air Release Valve be fitted with an inde
pendent bleeder line directed back to the wet well.
If multiple Air Release Valves are installed in a sys
tem, do not direct bleeder lines to a common mani
fold pipe. Contact your Gorman‐Rupp distributor or
the Gorman‐Rupp Company for information about
installation of an Automatic Air Release Valve for
your specific application.
ALIGNMENT
The alignment of the pump and the engine is criti
cal for trouble‐free mechanical operation. See Sec
tion E, Securing Intermediate And Drive Assem
bly To Engine for detailed information.