beautypg.com

Installation, Figure 24. combo heating - air handler, Figure 25. combo heating - baseboard – 30 – John Wood Power Direct Vent (ENERGY STAR) User Manual

Page 30

background image

Installation

The heating mode may be one of the following options:
A. A fan coil/air handler (Figure 24).
B. A hydronic baseboard (finned tube) loop/In floor heating

(Figure 25).

The following is a list of requirements for the installation of
the heating loop to the water heater.
1. Install shut-off valves and unions so that the water heater

can be isolated from the heating module should servicing
of the water heater become necessary.

2. Install a drain valve at the lowest point of the heating loop

so that water can be drained from the heating module
without affecting the water heater.

3. If the air handler does not have a venting means at the

highest point of the piping arrangement, install an air
bleed at the highest point of the plumbing arrangement.

WATER

HEATER

8in TO 12in

MAX.

H O T
OUTLET

EXPANSION TANK

(OPTIONAL)

MIXING
VALVE

COLD
INLET

CHECK VALVE

(IF USED

REQUIRES

EXPANSION

TANK)

COLD

SUPPLY

HOSE BIB
(OPTIONAL)

FLOW

CONTROL

SUPPLY

RETURN

CHECK
VALVE

EXTERNAL

CIRCULATOR

AIR HANDLER

HOT WATER

TO HOUSE

FIXTURE

C
H

M

I N T E R N A L
CIRCULATOR

DRAIN/PURGE
VALVE

Figure 24. Combo Heating - Air Handler

WATER

HEATER

8in TO 12in

MAX.

H O T
OUTLET

EXPANSION TANK

(OPTIONAL)

MIXING
VALVE

COLD
INLET

CHECK VALVE

(IF USED

REQUIRES

EXPANSION

TANK)

COLD

SUPPLY

HOSE BIB
(OPTIONAL)

FLOW

CONTROL

SUPPLY

RETURN

CHECK
VALVE

EXTERNAL

CIRCULATOR

HOT WATER

TO HOUSE

FIXTURE

C
H

M

HYDRONIC

BASEBOARDS

(SERIES

CONNECTED

SHOWN)

Figure 25. Combo Heating - Baseboard

– 30 –