beautypg.com

John Wood Envirosense Power Direct Vent (prior to May 2010) User Manual

Page 23

background image

23

5. Secure assembly to roof structure as shown in Figure E using

field supplied metal strapping or equivalent support material.

note: ensure termination height is above the roof surface or

anticipated snow level as shown in figure c.

6. Install rain cap and small diameter pipe assembly in

roof penetration assembly, Ensure small diameter pipe

i s c e m e n t e d a n d b o t t o m e d i n Y c o n c e n t r i c f i t t i n g .

7. Cement water heater combustion air intake and vent pipes to

concentric vent termination assembly. See Figure E for

proper pipe attachment.

8. Operate heater through 1 heat cycle to ensure combustion air

and vent pipes are properly connected to concentric vent termination

connections.

note: all vent terminations must be the same height when

installing multiple unit venting. If assembly is too short to meet

height requirement, the 2 pipes supplied in the kit may be replaced

by using same diameter, field supplied ULC S636 approved pipe.

do not extend the 21-1/8” dimension outer pipe to be more than

60 inches, see figure 25.

cautIon

Do not use field-supplied couplings to extend pipes. Airflow

restriction will occur and the heater pressure switch may cause

intermittent operation.

procedure 2 sIde wall terMInatIon, see figure 29.

fIGure 29.

1. Determine best location for termination kit.

NOTE: Consideration for the following should be used when

determining an appropriate location for the termination kit:

• Termination kit positioned where the vent vapors will

n o t d a m a g e p l a n t s / s h r u b s o r a i r c o n d i t i o n i n g

equipment.

• Termination kit positioned so it will not be affected by

wind eddy that may allow recirculation of combustion

products, or airborne leaves, or light snow.

• Termination kit positioned where it will not get damaged

or be subjected to foreign objects, such as stones,

balls, etc.

• Termination kit positioned where the vent vapors will

not be objectionable.

note: see the venting information (pages 16-20) in this

manual for additional vent location requirements.

2. Cut 1 hole (5 in. diameter)

3. Partially assemble concentric vent termination kit.

a) Cement the Y concentric fitting to larger diameter

kit pipe, see Figure 24.

b) Cement the rain cap to the smaller diameter kit

pipe, see Figure 24.

note: Instead of cementing the smaller pipe to the rain cap, a

field-supplied stainless steel screw may be used to secure the

2 components together when field disassembly is desired for

cleaning, see figure 27.

warnInG

when using alternate screw assembly method, drill clearance

hole in rain cap and pilot hole in vent pipe for screw being

used. failure to drill adequate holes may cause cracking

of pvc components, allowing combustion products to be

recirculated. failure to follow this warning could result in

personal injury or death.

warnInG

do not operate the heater with rain cap removed or

recirculation of combustion products may occur. water may

also collect inside larger combustion-air pipe and flow to the

burner enclosure. failure to follow this warning could result

in product damage or improper operation, personal injury

or death.

4. Install Y concentric fitting and pipe assembly through

structure’s hole.

note: do not allow insulation or other materials to accumulate
inside pipe assembly when installing through hole.

5. Install rain cap and small diameter pipe assembly in

Y concentric fitting and large pipe assembly. Ensure

small diameter pipe is bottomed and cemented in Y

concentric fitting.

6. Secure assembly to structure as shown in Figure G using field-

supplied metal strapping or equivalent support material.

note: ensure termination location clearance dimensions are as

shown in the diagrams found in figure 12 and figure 13. when

extending the length of the 4” pipe, the added length beyond

21-1/8” must be deducted from the maximum equivalent feet of

vent pipe.

note: If assembly needs to be extended to allow side wall

thickness requirement, the 2 pipes supplied in the kit may be

replaced by using same diameter, field-supplied ulc s636

approved pipe. do not extend 21 1/8” dimension more than 60

in. (see figure 25.)

cautIon

Do not use field-supplied couplings to extend pipes. Airflow

restriction will occur and the heater pressure switch may cause

intermittent operation.

7. Cement heater combustion-air and vent pipes to concentric

vent termination assembly. See Figure 30 for proper pipe

attachment.