5. Secure assembly to roof structure as shown in Figure E using
field supplied metal strapping or equivalent support material.
note: ensure termination height is above the roof surface or
anticipated snow level as shown in figure c.
6. Install rain cap and small diameter pipe assembly in
roof penetration assembly, Ensure small diameter pipe
i s c e m e n t e d a n d b o t t o m e d i n Y c o n c e n t r i c f i t t i n g .
7. Cement water heater combustion air intake and vent pipes to
concentric vent termination assembly. See Figure E for
proper pipe attachment.
8. Operate heater through 1 heat cycle to ensure combustion air
and vent pipes are properly connected to concentric vent termination
connections.
note: all vent terminations must be the same height when
installing multiple unit venting. If assembly is too short to meet
height requirement, the 2 pipes supplied in the kit may be replaced
by using same diameter, field supplied ULC S636 approved pipe.
do not extend the 21-1/8” dimension outer pipe to be more than
60 inches, see figure 25.
cautIon
Do not use field-supplied couplings to extend pipes. Airflow
restriction will occur and the heater pressure switch may cause
intermittent operation.
procedure 2 sIde wall terMInatIon, see figure 29.
fIGure 29.
1. Determine best location for termination kit.
NOTE: Consideration for the following should be used when
determining an appropriate location for the termination kit:
• Termination kit positioned where the vent vapors will
n o t d a m a g e p l a n t s / s h r u b s o r a i r c o n d i t i o n i n g
equipment.
• Termination kit positioned so it will not be affected by
wind eddy that may allow recirculation of combustion
products, or airborne leaves, or light snow.
• Termination kit positioned where it will not get damaged
or be subjected to foreign objects, such as stones,
balls, etc.
• Termination kit positioned where the vent vapors will
not be objectionable.
note: see the venting information (pages 16-20) in this
manual for additional vent location requirements.
2. Cut 1 hole (5 in. diameter)
3. Partially assemble concentric vent termination kit.
a) Cement the Y concentric fitting to larger diameter
kit pipe, see Figure 24.
b) Cement the rain cap to the smaller diameter kit
pipe, see Figure 24.
note: Instead of cementing the smaller pipe to the rain cap, a
field-supplied stainless steel screw may be used to secure the
2 components together when field disassembly is desired for
cleaning, see figure 27.
warnInG
when using alternate screw assembly method, drill clearance
hole in rain cap and pilot hole in vent pipe for screw being
used. failure to drill adequate holes may cause cracking
of pvc components, allowing combustion products to be
recirculated. failure to follow this warning could result in
personal injury or death.
warnInG
do not operate the heater with rain cap removed or
recirculation of combustion products may occur. water may
also collect inside larger combustion-air pipe and flow to the
burner enclosure. failure to follow this warning could result
in product damage or improper operation, personal injury
or death.
4. Install Y concentric fitting and pipe assembly through
structure’s hole.
note: do not allow insulation or other materials to accumulate
inside pipe assembly when installing through hole.
5. Install rain cap and small diameter pipe assembly in
Y concentric fitting and large pipe assembly. Ensure
small diameter pipe is bottomed and cemented in Y
concentric fitting.
6. Secure assembly to structure as shown in Figure G using field-
supplied metal strapping or equivalent support material.
note: ensure termination location clearance dimensions are as
shown in the diagrams found in figure 12 and figure 13. when
extending the length of the 4” pipe, the added length beyond
21-1/8” must be deducted from the maximum equivalent feet of
vent pipe.
note: If assembly needs to be extended to allow side wall
thickness requirement, the 2 pipes supplied in the kit may be
replaced by using same diameter, field-supplied ulc s636
approved pipe. do not extend 21 1/8” dimension more than 60
in. (see figure 25.)
cautIon
Do not use field-supplied couplings to extend pipes. Airflow
restriction will occur and the heater pressure switch may cause
intermittent operation.
7. Cement heater combustion-air and vent pipes to concentric
vent termination assembly. See Figure 30 for proper pipe
attachment.