English, Drain body installation – Pfister F-046-SYKK User Manual
Page 4
![background image](/manuals/291374/4/background.png)
ENGLISH
ENGLISH
10
11
12
13
14
DRAIN BODY INSTALLATION
10 HANDLE FLANGE INSTALLATION
Thread Handle Flanges (10A) into Valve Stems (10B). For better leverage, use
Installation Tool (10C), insert it into Hole (10D) and tighten so that the Handle Adapters
(10A) sit flush with the Spout Flange (10E). Forcefuly tighten Locknut (10F).
11 HANDLE INSTALLATION
With Valves in “Closed” position, attach Handle Levers (11A) onto Valve Stems (11B)
and tighten Set Screws (11C). Make sure Handle Levers (11A) are properly aligned
to sink.
12 POP-UP ROD CONNECTIONS
Insert Lift Rod (12A) into hole at Spout Flange (12B).
13 WATER SUPPLY CONNECTIONS
Connect water Supply Lines (13A) to Faucet Inlets (13B). Hot water supply lines go into
left inlet. Cold water supply lines go into right inlet. (Supply lines not included). Please
follow manufacturer’s instructions when installing supply lines.
14 POP-UP INSTALLATION
Install and adjust Pop-Up (14A) using separate instructions supplied with the Pop-Up
assembly.
4
HOT
COLD
10A
10B
10F
10A
10D
11A
11B
12B
12A
11B
11A
11C
13A
13B
13A
13B
10B
10E
10D
10C
10C
14A