beautypg.com

English, Drain body installation – Pfister F-046-SYKK User Manual

Page 4

background image

ENGLISH

ENGLISH

10

11

12

13

14

DRAIN BODY INSTALLATION

10 HANDLE FLANGE INSTALLATION

Thread Handle Flanges (10A) into Valve Stems (10B). For better leverage, use
Installation Tool (10C), insert it into Hole (10D) and tighten so that the Handle Adapters
(10A) sit flush with the Spout Flange (10E). Forcefuly tighten Locknut (10F).

11 HANDLE INSTALLATION

With Valves in “Closed” position, attach Handle Levers (11A) onto Valve Stems (11B)
and tighten Set Screws (11C). Make sure Handle Levers (11A) are properly aligned
to sink.

12 POP-UP ROD CONNECTIONS

Insert Lift Rod (12A) into hole at Spout Flange (12B).

13 WATER SUPPLY CONNECTIONS

Connect water Supply Lines (13A) to Faucet Inlets (13B). Hot water supply lines go into
left inlet. Cold water supply lines go into right inlet. (Supply lines not included). Please
follow manufacturer’s instructions when installing supply lines.

14 POP-UP INSTALLATION

Install and adjust Pop-Up (14A) using separate instructions supplied with the Pop-Up
assembly.

4

HOT

COLD

10A

10B

10F

10A

10D

11A

11B

12B

12A

11B

11A

11C

13A

13B

13A

13B

10B

10E

10D

10C

10C

14A