beautypg.com

Dexter Laundry T-30X2 EXPRESS - Electric (On-Premise) User Manual

Page 4

background image


-4-

INSTALLATION AND OPERATING INSTRUCTIONS

UNCRATING

Tools Required: 3/4" hex socket & ratchet driver, wood block 4" or 5" thick, a knife and a
groove joint pliers, which will open to 1 3/8".

1. Remove and discard packaging.

2. The crate base is attached to the dryer by (4) cap screws driven upward from below the

crate base. Remove crate base from dryer, by tipping dryer sidewise and place block
under crate base rail in center of dryer. Using a ratchet and 3/4" hex socket, remove and
discard (2) crating bolts from side, which is raised. Remove block from under crate base.
Repeat for other side.

3. Install leveling legs. Using a walking motion, move dryer sideways about 6" off crate

base. Tip dryer up and place block under edge of dryer. Thread two leveling legs about
two-thirds into the T-nuts on the base from which the crating bolts were removed.
Remove block from under dryer.

With a walking motion move dryer completely off crate base. Discard crate base.

Tip dryer sidewise, as previously done, and place block under edge of dryer on raised side.
Thread leveling legs into nuts as was done for the first side.

Slide unit into position where it will be installed. Adjust leveling legs, using the groove joint
pliers, to level and align dryer with adjacent units.


DRYER INSTALLATION

1. CODE CONFORMITY: All commercial dryer installations must conform to the local and
national codes for the location of installation. Prior to installation, ensure that the local
distribution conditions (identification of the type) and the adjustment of the appliance are
compatible.

2. INSTALLATION CLEARANCES: This unit may be installed at the following alcove
clearance.

I. Left Side

0 in.

II. Right Side 0 in.
III. Back

18 in. (457 mm) (Certified for 6 in. (152 mm) clearance; however, 18 in.
(457 mm) clearance is necessary behind the motors to allow servicing and
maintenance.)

IV. Front

48 in. (1220 mm) to allow use of dryer.

V. Top

Refer to figure labeled “Vertical Clearance Dimensions”.
AB. Certification allows 0 in. clearance at the top 4 in. (102 mm) back
from the front. However, a 1/4 in. (6 mm) clearance should be allowed in
case the dryer needs moving.