5 after the test run – R&M Materials Handling VARIABLE SPEED CONTROLS ControlMaster NXT Service Manual User Manual
Page 42

R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319
42/53
R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.
6.5
After the test run
Record the parameter value changes in a parameter list.
Changed values are needed if the frequency converter will be
replaced with a new one.
Upon completing the test:
Ensure that all of the remarks and parameter values are sent
to the manufacturer. Up to date parameter list ensure correct
parameter settings in spare part deliveries. See the section
“Manufacturer” for contact information.