Warning, Hc j – Peerless-AV PJF2-UNV-S - Installation User Manual
Page 4
ISSUED: 01-14-09 SHEET #: 056-9018-2 05-18-10
Visit the Peerless Web Site at www.peerlessmounts.com
4 of 9
For customer care call 1-800-729-0307 or 708-865-8870.
H
C
WOOD JOIST
Drill two 5/32" (4 mm) dia. holes to a minimum
depth of 2.5" (64 mm). Attach ceiling plate (
C)
with two #14 x 2.5" (6 mm x 65 mm) wood
screws (
H) as shown using 3/8" (10 mm) socket
wrench.
Skip to step 3 for flush mount installation.
Skip to step 4 for extension column
installation.
For Optional Cord Management,
install two spacers (
J) between ceiling
plate (
C) and ceiling.
Installation To Wood Joist Finished Ceilings,
Exposed Wood Joists, or Wood Beam Ceilings
WOOD JOIST
CEILINg
H
C
J
• Tighten wood screws (
H) so that ceiling plate (C) is
firmly attached, but do not overtighten. Overtighten-
ing can damage the screws, greatly reducing their
holding power.
• Never tighten in excess of 80 in • lb (9 N.M.).
• Make sure that mounting screws are anchored into
the center of the studs. The use of an "edge to edge"
stud finder is highly recommended.
WARNING
• It is the responsibility of the installer to verify that the
supporting surface will safely support the combined
load of all attached hardware and components.
WARNING
1
IMPORTANT: Be sure to drill holes into the
joist CENTER!
CEILINg