Warning, Rs c – Peerless-AV PLAV70-UNLP-GB - Installation User Manual
Page 7
7 of 14
ISSUED: 11-21-06 SHEET #: 202-9180-7 06-14-12
To route cables through cord management
channels:
Slide one mesh sleeve (T) over
each cable. Use cable ties (S) to tighten mesh
sleeves to cables.
Pull cords through cord management
channels, leaving enough slack to allow full
range of movement for swing arm assembly
(C) as shown if fi gure 3.1.
3
3-1
T
fi g 3.1
To route cables using cable management clips:
Snap eight cable management clips (R) into both
swing arms (C) as shown in fi gure 3.2. Cable ties
(S) are used with clips for cord management.
Slide one mesh sleeve (T) over each cable. Use
cable ties (S) to tighten mesh sleeves to cables.
3
CORD
MANAGEMENT
CHANNEL
C
3-1
Note: There are three mounting positions.
The center position is shown right. Arm
assemblies must be mounted with one
mounting hole separating them. Slide washers
(J) over wall support arm axles (D). Next, insert
plastic caps (N) into axles. Then, insert holding
pins (M) into axles. See detail 1.
Note: Fit of axles (D) into wall plate (A) and arm
assembly (C) will be tight. Gently tap into place
with a hammer if necessary.
Insert socket cap screws (K) into hole at bottom
of wall support arm axles (D) as shown in detail 3.
Tighten screw using 9/64" allen wrench (Q).
Place arm assembly (C) with washers (J) into
wall plate (A). Insert axle assemblies shown in
detail 1 through wall plate (A), arm assembly (C),
and washers (J). Lock axles in place by aligning
holding pins (M) with notches shown in detail 2.
2
2-1
2-2
N
J
D
M
A
J
C
DETAIL 3
NOTCH
DETAIL 2
DETAIL 1
R
S
C
fi g 3.2
• If you are uncertain that product is properly installed, call customer care.
WARNING
K
D