Warning, Ao p – Peerless-AV PLAV70 - Installation User Manual
Page 4
4 of 10
ISSUED: 05-02-06 SHEET #:202-9089-4 06-29-11
Wall plate (A) can be mounted to two studs that are 16" apart. Use a stud fi nder to locate the edges of the studs.
Use of an edge-to-edge stud fi nder is highly recommended. Based on their edges, draw a vertical line down each
stud’s center. Place wall plate on wall as a template. The top mounting slots should be located 4.3" below the
desired screen center. Level plate, and mark the center of the eight mounting holes. Make sure that the mounting
holes are on the stud centerlines. Drill eight 7/32" dia. holes 3" deep. Make sure that the wall plate is level, secure it
using eight 5/16 x 3" wood screws (O) and washers (P).
Skip to step 2 on page 6.
1
• Installer must verify that the supporting surface will safely support the combined load of the equipment and all
attached hardware and components.
• Tighten wood screws so that wall plate is fi rmly attached, but do not overtighten. Overtightening can damage the
screws, greatly reducing their holding power.
• Never tighten in excess of 80 in. • lb (9 N.M.).
• Never mount this product to metal studs.
• Make sure that mounting screws are anchored into the center of the stud. The use of an "edge to edge" stud fi nder
is highly recommended.
• Hardware provided is for attachment of mount through standard thickness drywall or plaster into wood studs. Install-
ers are responsible to provide hardware for other types of mounting situations.
• Never exceed the Maximum UL Load Capacity of 200 lb (91 kg).
WARNING
Installation to Wood Stud Wall
A
O
P