beautypg.com

Grain Systems Unload Augers PNEG-1735 User Manual

Page 13

background image

4. Installation

PNEG-1735 U-Trough Direct Gear Drive Bin Sweep Auger Unload Systems

13

4. Layout aeration floor and cut opening around gates, approximately 1" larger than gate openings.

5. Attach floor flanges to floor with self-drilling screws.

6. Ensure that there is a minimum of 1/4" clearance between the bottom edge of the floor flange and

the unload.

Figure 4C

Figure 4D

Figure 4E

Figure 4F

Ensure clearance between
bottom of floor flange and gate

U-Trough center floor flange comes in two (2) parts.
Before installing bolt together with joiner strips provided.