beautypg.com

Installation, Chapter 4 installation, Installation under aeration floor – Grain Systems Unload Augers PNEG-1735 User Manual

Page 12

background image

12

PNEG-1735 U-Trough Direct Gear Drive Bin Sweep Auger Unload Systems

4. Installation

Installation Under Aeration Floor

1. Cut 12" x 12" (30 cm x 30 cm) opening in bin wall where unload is to exit bin.

(See Figure 4A.)

2. Insert unload and center it in the bin.

3. Secure unload with anchor bolts (not supplied) to the bin foundation.

Figure 4A

Figure 4B

Do not cut across bolted seams.

Cut 12" x 12" access
through bin wall

U-Trough unload. Center
in bin and anchor to floor.

Concrete anchor
bolt