Chapter 7: roof assembly – Grain Systems Tanks PNEG-4078 User Manual
Page 77
Table 7-1 A-frame installation sequence and temperature cable locations for 78 ft diameter bin
A-frame number
Rafter Number
Temp Cable Number
Radius Location
A1
R1
—
—
R2
T13
28.6 ft
A2
R11
T7
28.6 ft
R12
—
—
A3
R21
—
—
R22
T11
28.6 ft
A4
R15
—
—
R16
—
—
A5
R5
T5
14 ft
R6
—
—
A6
R9
—
—
R10
—
—
A7
R23
—
—
R24
—
—
A8
R19
T3
14 ft
R20
T10
28.6 ft
A9
R3
—
—
R4
T14
28.6 ft
A10
R17
T9
28.6 ft
R18
—
—
A11
R7
—
—
R8
T6
28.6
A12
R13
T2
14 ft
R14
T8
28.6 ft
A13
R25
T12
28.6 ft
R26
T4
14 ft
NA
Attach to center collar
T1
5 ft
NOTE: A-frames labeled “A1” through “A5” have X-bracing and are installed first. A-frames labeled “A6”
through “A13” are standard A-frames. The empty spaces that are not labeled must have purlins
installed between the rafters after all the A-frames are secured. The numbers reflect the recom-
mended installation sequence of the A-frame assemblies.
Table 7-2 Starting lengths for temperature cables for 78 ft diameter bins
Length from the center collar
226.7 in. (575.82 cm)
Length from 14 ft diameter location
166.8 in. (423.67 cm)
Length from 28.6 ft diameter location
62.6 in. (159 cm)
The temperature cable lengths in the chart above are the distances from where the temperature cable
attaches to the rafter or the center collar to the top ring. To calculate the correct temperature cable length,
add 32 inches for each bin ring to the starting length. Temperature cables must terminate above any
unload equipment and be secured in place with twine. DO NOT allow cables to become tangled in unload
equipment.