beautypg.com

Chapter 7: roof assembly – Grain Systems Tanks PNEG-4078 User Manual

Page 108

background image

Chapter 7: Roof Assembly

NOTE: Ensure that holes are drilled from inside of the bin.

16.Field drill holes (C) into the roof panels (A) through holes in the top flange of the rafters (E). Fasten

the panels and the rafters securely using 5/16 in. bolts.

NOTE: Ensure that holes are drilled from inside of the bin.

IMPORTANT: Failure to properly secure the roof panel to the purlin and the rafter will constitute a

modification to the product not specifically delineated in this manual and will void the
limited warranty.

A

Roof panel (CTR-0267 and CTR-0268)

D

Purlin

B

Roof panel holes (drilled through purlin)

E

Rafter

C

Roof panel holes (drilled through rafter)

108

Pneg-4078 78 Ft Diameter 40-Series Bin