Chapter 7: roof assembly – Grain Systems Tanks PNEG-4090 User Manual
Page 78
Table 7-1 A-frame installation sequence and temperature cable locations for 90 ft diameter bin
A-frame number
Rafter Number
Temp Cable Number
Radius Location
A1
R1
T16
35.5 ft
R2
T2
14.8 ft
A2
R19
T12
35.5 ft
R20
T5
14.8 ft
A3
R13
T10
35.5 ft
R14
T4
14.8 ft
A4
R7
T8
35.5 ft
R8
T3
14.8 ft
A5
R25
T14
35.5 ft
R26
T6
14.8 ft
A6
R23
—
—
R24
—
—
A7
R5
—
—
R6
—
—
A8
R15
—
—
R16
T11
35.5 ft
A9
R27
—
—
R28
T15
35.5 ft
A10
R29
—
—
R30
—
—
A11
R11
—
—
R12
—
—
A12
R17
—
—
R18
—
—
A13
R3
—
—
R4
T7
35.5 ft
A14
R9
—
—
R10
T9
35.5 ft
A15
R21
—
—
R22
T13
35.5 ft
NA
Attach to center collar
T1
5 ft
NOTE: A-frames labeled “A1” through “A5” have X-bracing and are installed first. A-frames labeled “A6”
through “A15” are standard A-frames. The empty spaces that are not labeled must have purlins
installed between the rafters after all the A-frames are secured. The numbers reflect the recom-
mended installation sequence of the A-frame assemblies.
Table 7-2 Starting lengths for temperature cables for 90 ft diameter bins
Length from the center collar
268.9 in. (683.01 cm)
Length from 14.8 ft diameter location
202.1 in. (513.33 cm)
Length from 35.5 ft diameter location
55.4 in. (140.72 cm)
78