beautypg.com

Inside ladder placement – Grain Systems Tanks PNEG-2135 User Manual

Page 78

background image

10. 2.66" Commercial Tank Accessories Installation

78

PNEG-2135 Construction Manual for 2.66" Corrugation 135' Diameter Tank

Inside Ladder Placement

The inside ladder package includes the ladder, starter brackets, standoff brackets, reinforcement straps
and ending bracket. Begin by positioning the ladder directly under the manway roof panel and install the
starter bracket as shown

in Figure 10O

. Place the standoff brackets every horizontal seam or 32" vertically

on the sidewall sheets. A strap is then used from one standoff bracket to the next. Use 5/16" bin bolts to
attach the standoff brackets to the sidewall.

Figure 10O Inside of Grain Bin

The inside ladder package for 135' diameter commercial bins include a strap (LDR-5132) that runs
from one standoff bracket (LDR-4314) to the next. Begin assembling the straps in the second ring of
the sidewall.

Refer to diagram and follow the correct dimensions as shown

in Figure 10P on Page 79

. The ladder starter

brackets must be located in line with the horizontal seam. Check the 4' ladder section to make sure the
ladder rung dimples are to the top surface and attach to the starter brackets using the hole located 1"
from the top of the ladder.