8. 2.66" Commercial Tank Stiffener Instructions (Outside Stiffened)

PNEG-2135 Construction Manual for 2.66" Corrugation 135' Diameter Tank

49

Wind Ring Assembly

Figure 8Q

1. To connect wind ring pipe to the stiffeners, attach with 3/8" x 1" bolts through the flange of the

stiffener. In some cases field drilling of wind ring locations may be required.

2. Attach wind ring pipe section to stiffener using two (2) 3/8" x 6" (S-7248) wind ring clamps.

3. Place pipes end-to-end without overlapping. Fasten together using two (2) wind ring couplers and

six (6) 3/8" x 1" flanged head bolts with flanged nuts. Couplers should be centered on the seam
of pipes.

Figure 8R

Wind rings must be installed in relation to
the ladder rungs as shown here, to ensure
compliance with O.S.H.A. regulations.