PNEG-739 42" - 48" Platforms & Safety Cages

19

42'' Head Service Platform

1

Assemble the deck hatch access door by attach-
ing the left and right hand hinges to bottom side
of the outside toeboard, using 5/16" x 1" carraige
bolts. Leave hardware loose until the assembly
is complete. Attach the hinges & hatch decking
to the angle frame weldment and double nut the
hinge bolts - do not overtighten. (See Figure 1-9)

Hatch Access Door

FIGURE 1-9

Right Hand
Hatch Hinge

Left Hand
Hatch Hinge

Decking Hatch
Frame Weldment

GSB36222 (1)
Hatch Service
Hatch Decking

FIGURE 1-9