Series 2000 heater service – Grain Systems PNEG-582 User Manual
Page 23

23
SERIES 2000 HEATER SERVICE
All Airstream heaters are con-
structed of durable weather-resis-
tant materials, so a minimum
amount of service should be re-
quired; however before the unit is
started for the first time each sea-
son there are a few items that need
to be checked out. All damaged
parts should be repaired or re-
placed.
1. Disconnect and lock out power
to fan and heater. Open control
box lid and inspect all compo-
nents for moisture, vibration or
rodent damage. Inspect and
tighten all loose terminal con-
nections. Replace any damaged
wiring.
2. Remove burner orifice tube and
inspect for dirt or foreign mate-
rial. Clean out if necessary.
3. Inspect burner for wear or for-
eign material in any of the ports.
Clean or replace parts if necessary.
4. Inspect the spark plug and flame
probe for corrosion and dam-
age. Clean or replace if necessary.
The Series 2000 control box.
- PNEG-1890 (16 pages)
- PNEG-595 (26 pages)
- PNEG-1472 (30 pages)
- PNEG-897 (58 pages)
- PNEG-838 (4 pages)
- PNEG-1755 (36 pages)
- PNEG-524 (24 pages)
- PNEG-1080 (2 pages)
- PNEG-728 (47 pages)
- PNEG-673 (57 pages)
- PNEG-1717 (88 pages)
- PNEG-823 (42 pages)
- PNEG-630-6S (23 pages)
- PNEG-1876 (80 pages)
- PNEG-102 (2 pages)
- PNEG-366 (51 pages)
- PNEG-1626 (1 page)
- PNEG-1874 (78 pages)
- PNEG-1798 (34 pages)
- PNEG-1927 (4 pages)
- PNEG-924 (2 pages)
- PNEG-012 (46 pages)
- PNEG-1797 (86 pages)
- PNEG-546 (26 pages)
- PNEG-951 (102 pages)
- PNEG-1650 (92 pages)
- PNEG-1649 (50 pages)
- PNEG-1376 (88 pages)
- PNEG-361 (46 pages)
- PNEG-338 (32 pages)
- PNEG-1276 (78 pages)
- PNEG-1283 (22 pages)
- PNEG-1089 (14 pages)
- QSG-001 (2 pages)
- PNEG-950 (96 pages)
- PNEG-1590 (3 pages)
- PNEG-501 (33 pages)
- PNEG-1447 (68 pages)
- PNEG-707GSI (446 pages)
- PNEG-349 (32 pages)
- PNEG-236 (22 pages)
- PNEG-743 (16 pages)
- PNEG-900 (54 pages)
- PNEG-1935 (92 pages)