beautypg.com

VEGA VEGAPULS 61 (≥ 2.0.0 - ≥ 4.0.0) Profibus PA Approval according to LPR radio standard User Manual

Page 39

background image

-

Condensation

-

Slight foam generation

-

Overfilling possible

Storage tank on ships (Cargo Tank):

l

Product speed: slow filling and emptying

l

Vessel:

-

Installations in the bottom section (bracers, heating spirals)

-

High sockets 200 … 500 mm, also with large diameters

l

Process/measurement conditions:

-

Condensation, buildup by movement

-

Max. requirement on measurement accuracy from 95 %

Stirrer vessel (reactor):

l

Setup: all vessel sizes possible

l

Product speed:

-

Fast to slow filling possible

-

Vessel is very often filled and emptied

l

Vessel:

-

Socket available

-

Large agitator blades of metal

-

Vortex breakers, heating spirals

l

Process/measurement conditions:

-

Condensation, buildup by movement

-

Strong spout generation

-

Very agitated surface, foam generation

Dosing vessel:

l

Setup: all vessel sizes possible

l

Product speed:

-

Fast filling and emptying

-

Vessel is very often filled and emptied

l

Vessel: narrow installation situation

l

Process/measurement conditions:

-

Condensation, buildup on the antenna

-

Foam generation

Standpipe:

l

Product speed: very fast filling and emptying

l

Vessel:

-

Vent hole

-

Joins like flanges, weld joints

-

Shifting of the running time in the tube

l

Process/measurement conditions:

-

Condensation

-

Buildup

Bypass:

VEGAPULS

61 • Approval according to LPR radio standard

39

6 Set up with the indicating and adjustment module

41715

-

EN

-120301