VEGA VEGAPULS 61 (≥ 2.0.0 - ≥ 4.0.0) Modbus and Levelmaster protocol User Manual
Page 35
35
6 Set up the sensor with the indicating and adjustment module
VEGAPULS 61 • Modbus and Levelmaster protocol
41361-EN-121011
•
Product speed:
– Fast to slow filling possible
– Vessel is very often filled and emptied
•
Vessel:
– Socket available
– Large agitator blades of metal
– Vortex breakers, heating spirals
•
Process/measurement conditions:
– Condensation, buildup by movement
– Strong spout generation
– Very agitated surface, foam generation
Dosing vessel:
•
Setup: all vessel sizes possible
•
Product speed:
– Fast filling and emptying
– Vessel is very often filled and emptied
•
Vessel: narrow installation situation
•
Process/measurement conditions:
– Condensation, buildup on the antenna
– Foam generation
Standpipe:
•
Product speed: very fast filling and emptying
•
Vessel:
– Vent hole
– Joins like flanges, weld joints
– Shifting of the running time in the tube
•
Process/measurement conditions:
– Condensation
– Buildup
Bypass:
•
Product speed:
– Fast up to slow filling with short up to long bypass tube possible
– Often the level is hold via a control facility
•
Vessel:
– Lateral outlets and inlets
– Joins like flanges, weld joints
– Shifting of the running time in the tube
•
Process/measurement conditions:
– Condensation
– Buildup
– Separation of oil and water possible
– Overfilling into the antenna possible
Plastic tank:
•
Vessel:
– Measurement fix mounted or integrated
– Measurement depending on the application through the vessel
top
– With empty vessel, the measurement can be carried out
through the bottom