beautypg.com

4 switch-on phase – VEGA VEGAPULS 61 (≥ 2.0.0 - ≥ 4.0.0) Modbus and Levelmaster protocol User Manual

Page 30

background image

30

5 Connecting to power supply and bus system

VEGAPULS 61 • Modbus and Levelmaster protocol

41361-EN-121011

+

+

power supply

MODBUS

D0

D1

IS GND

USB

1

2

1

3 4 5

2

off on

( )

(

)

(-)

(-)

Fig. 28: Connection compartment
1 USB connection

2 Slide switch for integrated termination resistor (120 Ω)

Terminal

Function

Polarity

1

Voltage supply

+

2

Voltage supply

-

3

Modbus-Signal D0

+

4

Modbus-Signal D1

-

5

Function ground with installa-

tion according to CSA

5.4 Switch-on phase

After VEGAPULS 61 is connected to the bus system, the instrument

carries out a self-test for approx. 30 seconds. The following steps are

carried out:

Internal check of the electronics

Indication of the instrument type, hardware and software version,

measurement loop name on the display or PC

Indication of the status message "F 105 Determine measured

value" on the display or PC

Status byte goes briefly to fault value

As soon as a plausible measured value is found, it is outputted to the

signal cable. The value corresponds to the actual level as well as the

settings already carried out, e.g. factory settings.

Connection compartment