York YCAS0130 User Manual
Air-cooled screw liquid chillers, 60 hz
Table of contents
Document Outline
- 201.19-NM1
- SECTION 1 - GENERAL CHILLER INFORMATION & SAFETY
- SECTION 2 - PRODUCT DESCRIPTION
- SECTION 3 - HANDLING AND STORAGE
- SECTION 4 - INSTALLATION
- LOCATION REQUIREMENTS
- OUTDOOR INSTALLATIONS
- INDOOR INSTALLATIONS
- LOCATION CLEARANCES
- COMPRESSOR FEET BOLT REMOVAL
- VIBRATION ISOLATORS
- SHIPPING BRACES
- PIPEWORK CONNECTION
- WATER TREATMENT
- PIPEWORK ARRANGEMENT
- CONNECTION TYPES & SIZES
- EVAPORATOR CONNECTIONS
- REFRIGERANT RELIEF VALVE PIPING
- DUCTWORK CONNECTION
- ELECTRICAL CONNECTION
- POWER WIRING
- STANDARD UNITS WITH MULTI POINT POWER SUPPLY WIRING
- 115VAC CONTROL SUPPLY TRANSFORMER
- CONTROL PANEL WIRING
- VOLTS FREE CONTACTS
- SYSTEM INPUTS
- SECTION 5 - COMMISSIONING
- SECTION 6 - OPERATION
- SECTION 7 - TECHNICAL DATA
- FLOW RATE AND PRESSURE DROP CHARTS
- GLYCOL CORRECTION FACTORS
- TEMPERATURE AND FLOWS
- PHYSICAL DATA
- OPERATING LIMITATIONS AND SOUND POWER DATA
- WIRING DIAGRAM
- ELEMENTARY DIAGRAM
- CONNECTION DIAGRAM
- COMPRESSOR TERMINAL BOX
- DIMENSIONS
- TECHNICAL DATA
- WEIGHT DISTRIBUTION AND ISOLATOR MOUNTING POSITIONS
- INSTALLATION INSTRUCTIONS FOR VMC SERIES AWR/AWMR AND CP RESTRAINED MOUNTINGS
- COMPRESSOR COMPONENTS
- SYSTEM STARTUP CHECKLIST
- UNIT CHECKS
- PROGRAMMED VALUES
- INITIAL START-UP
- CHECKING SUBCOOLING AND SUPERHEAT
- CHECKING ECONOMIZER SUPERHEAT
- LEAK CHECKING
- SECTION 8 - MICRO PANEL CONTENTS
- CHILLER CONTROL PANEL PROGRAMMING AND DATA ACCESS KEYS
- DISPLAY AND STATUS INFORMATION KEYS
- ON / OFF ROCKER SWITCH
- PROGRAM & SETUP KEYS
- 1. INTRODUCTION & PHYSICAL DESCRIPTION
- 2. STATUS KEY: GENERAL STATUS MESSAGES & FAULT WARNINGS
- 3. DISPLAY KEYS & OPTION SWITCHES
- 4. PRINT KEYS
- 5. ENTRY KEYS
- 6. SETPOINTS KEYS & CHILLED LIQUID CONTROL
- 7. CLOCK KEYS
- 8. PROGRAM KEY
- SECTION 9 - MAINTENANCE
- SECTION 10 - SPARE PARTS
- SECTION 11 - TROUBLESHOOTING GUIDE