Xerox Nuvera™ 100/120 Digital Copier/Printer Customer Expectations Document

- 8 -

Product Space & Power Requirements

Item

Xerox Nuvera™ 100/120 Digital
Copier/Printer

Comments

Size – Printer
w/ 1 SFM &
Professional
MFF

131.3” (W) x 30” (D) x 61.6” (H)
3336mm x 736mm x 1565.6mm

Width –
additional
SFM

31.7” ( 805mm)

Optional

Service Space

Fixed: 162” (W) x 113” (D)
( 4114.8mm x 2870.0mm)
Moveable: 162” (W) x 92” (D)
( 4114.8mm x 2336.8mm)

- Fixed (stationary) installation: rear of the
system should be at least 30” from the wall.
- Moveable installation: rear of the system
should be at least 10” from the wall and must
be on mobility plates OR hard surface floor
AND 4 modules or less.

Weight

1,753 lb. (795.1 kg)
Additional SFM – 423 lbs. (191.9 kg)

With consumables loaded (except media)

Power and
Agency
Requirements

North America

208 Volts / 30 Amp sole use, 60 Hz
Two phase, 3 wire + PE (L1, L2, N, GND)

UL & cUL compliant

Complies with the FEMP (Federal Energy

Management Program) via the machine
circuit breaker (CB); with the CB switched
off, the system consumes less than 1 watt.

Energy Star (eStar) compliant

Environmental Choice (Canada)

Complies with Section 508 of the ADA
Rehabilitation Act

Power
Requirements

Europe/Japan

200-240 Volts / 25 Amp sole use, 50 Hz
Single phase, 2 wire + PE (L, N, GND)

Energy Star (eStar) compliant

Units are compliant with applicable EU

directives and are CE marked

System Configuration and Installation

Installation Preparation Document

This section should be used in conjunction with the Xerox Nuvera™ 100/120 Digital Copier/Printer
Installation Planning Guide (IPG) and the Xerox Nuvera™ 100/120 Digital Copier/Printer Installation
Preparation Document (IPD), which contain detailed specifications for size, weight, electric, and
environmental conditions. Only the most important requirements are stated here.

Customer Responsibilities

The following must be completed before the system can be delivered and will be assessed in the final site
check:

Item

Comments

Identify placement of the system

Ensure the printer can be delivered to the site

Supply the appropriate electrical connections

Dedicated power required

Install an exhaust duct to vent hot air to the air
system or the outside if required

Heat Vent Kit is available for stationary system
installations only. The kit lowers the system’s output
from approximately 17,500 BTU/hour to 8,500 BTU/hr.

Verify the strength and slope of the floor