beautypg.com

Installation — assembly, Gold gv water boiler — series 3, Finish the vent installation – Weil-McLain STAR-34 User Manual

Page 8

background image

Part Number 550-110-268/0699

8

GOLD GV Water boiler — Series 3

Weil-McLain

500 Blaine Street

Michigan City, IN 46360-2388

http://www.weil-mclain.com

Installation — assembly

continued

Finish the vent

installation

Figure 11

Installation of condensate tubing

Sealant recommended by vent pipe manufacturer must be used as indicated
in their instructions. Vent and combustion air connector piping must be
sealed gas-tight to prevent possibility of flue gas spillage and carbon
monoxide emissions, resulting in severe personal injury or death.

1. See

Figure 11

to install condensate tubing

(provided by others). Use condensate pump
if floor drain is higher than condensate drain
on boiler.
If required:

use a low-profile pump — OR —

set boiler on foundation (see

GV Series

3 Boiler Manual

) to allow gravity flow

to pump.

2. Size pump in gal/hr. (boiler model):

0.78 (GV-3)

1.17 (GV-4)

1.56 (GV-5)

1.95 (GV-6)

Refer to pump manufacturer's instructions.
Drain to a non-freezing area.

Installing condensate tubing

If vent pipe or combustion air pipe must be reassembled

When vent pipe or combustion air pipe is disconnected for any reason, it must be reassembled
and resealed according to this Venting Supplement, the direct vent termination kit instructions
and the vent pipe manufacturer's instructions.

26806

StaR-34
vent starter tee

5/8" O.D. tubing,
provided by
others

Ve

n

t