Installation — assembly, Gold gv water boiler — series 3, Connect vent starter tee to boiler – Weil-McLain STAR-34 User Manual

Page 6: Construct vent and optional combustion air run, Connect vent run to termination

background image

Part Number 550-110-268/0699

6

GOLD GV Water boiler — Series 3

Installation — assembly

Connect vent starter

tee to boiler

Follow the instructions in the

GV Series 3 Boiler Manual

section II

II

II

II

IIb

b

b

b

b to connect the vent

starter tee to the boiler.

Construct vent and

optional

combustion air run

Follow vent pipe manufacturer's instructions for sealing the vent. Vent and
combustion air connector piping must be sealed gas-tight to prevent
possibility of flue gas spillage and carbon monoxide emissions, resulting in
severe personal injury or death.

1. Follow

StaR-34

manufacturer's instructions to construct vent run and for methods of

supporting vent runs.

Clean joints before sealing. See vent pipe manufacturer's instructions to clean joints.

Use their specified sealant (maximum 250

0

F flue temperature). Do not use screws.

Do not mix types or manufacturers of vent materials.

Maintain minimum one-inch clearance from combustible materials to vent pipe; 0"
clearance for noncombustible materials.

Install vent pipe with seams on top of vent runs.

If needed, male end of vent pipe may be cut to provide correct length. See vent pipe
manufacturer's instructions for use.

2. If installing with direct vent method, use instructions provided with Weil-McLain

termination kit. See

Figures 3

,

4

or

5

on page 5.

Venting through sidewall

Connect vent run to

termination

1. If using Weil-McLain Vent/Air Intake Termination Kit, see instructions provided in that

kit. Applies to direct (

Figure 3

, page 5) or non-direct vent (

Figure 4

, page 5) method.

2. If using non-direct method with termination coupling only, see

Figures 8

and

9

.

If passing through noncombustible wall, provide hole diameter large enough to insert
the pipe through. Sleeve and spacers are not required.

3. Maintain minimum one-inch clearance from combustible materials to vent pipe; 0"

clearance for noncombustible materials.

4. Refer to vent termination

WARNING

, item 19 on page 3.

1. Direct vent method — follow instructions supplied in Weil-McLain Through-Roof or

Through-Unused-Chimney Termination Kit to assemble termination.

2. Non-Direct vent method (only through the roof, not through chimney):

Vent pipe must extend through roof flashing, jacket or thimble. See

Figure 10

.

Vent may pass through floor, inside wall or concealed space when installed according
to vent pipe manufacturer's instructions.

3. Maintain minimum one-inch clearance from combustible materials to vent pipe.

Venting through existing chimney or roof