beautypg.com

Installation, Gold gv water boiler — series 3, Pre-installation planning – Weil-McLain STAR-34 User Manual

Page 4

background image

Part Number 550-110-268/0699

4

GOLD GV Water boiler — Series 3

Installation

Pre-installation planning

1. Follow national, state, local or provincial codes or

regulations when venting GV boiler.

2. Choose vent method from those shown on page 5.
3. Select vent run components from

Table 2

.

Table 3

states maximum vent run lengths and number of
elbows. Do not exceed data in

Table 3

. Longer vent

runs will slightly reduce boiler output. See

Figure 2

.

4. If installing with direct vent method, use same

maximum run length and number of elbows from

Description

Flex-L International, Inc.

Part Number (Note 1)

GV starter tee

--

GV termination coupling

SRAWGVT

45

o

elbow

SRE4503

90

o

elbow

SRE9003

6" pipe

SR06P03

1' pipe

SR12P03

2' pipe

SR24P03

3' pipe

SR36P03

5' pipe

SR60P03

Joiner band

SRJB-14

Weil-McLain Vent/Air Intake Termination Kit

382-200-430 (Note 2)

Weil-McLain Through-Roof or Through-Unused-Chimney Termination Kit

382-200-435 (Note 2)

Notes

1. Flex-L International, Inc. part number. Parts available through Flex-L International, Inc.
2. Weil-McLain part number. Parts available through Weil-McLain distributor.

Table 2

Parts list

step 2. Vent and combustion air connector piping
configurations must match. Use suitable 3" material
for combustion air connector piping, such as:

Dryer vent

Galvanized steel

PVC (3" I.D.)

5. Refer to vent termination

WARNING

, item 19 on

page 3.

Table 3

Vent and combustion air connector piping
lengths and number of elbows

Figure 2

Boiler output

Maximum vent
length
(feet)

Total number of elbows

0

2

3

4

5

6

7

8

GV-3 through GV-5 100 80

70

60

50

40

30

20

GV-6

80

60

50

40

30

20

10

--

GV-6

GV-5

GV-4

GV-3

0

20

40

60

80

100

Total equivalent length (feet) of vent
(from boiler to vent termination)

%

Out

put

95

96

98

97

99

100

26800