beautypg.com

Warning, Attaching hor tracks to vertical tracks, Adjusting top brackets – Wayne-Dalton 8300 User Manual

Page 9: End bearing brackets, Center bearing bracket

background image

Please Do not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer,

refer to your local yellow pages business listings or go to the find a Dealer section online at www.wayne-dalton.com

(4) 1/4”- 20 x 5/8”

Self-drilling screws

(3) 1/4”- 20 x 7/8”

Self-drilling screws

(4) 5/16”- 18 x 3/4”

Bolts and nuts

Upper half

U-bar

Lower half

Attaching hor Tracks to vertical Tracks

12

Tools: Ratchet wrench, 7/16” Socket, 9/16” Socket, 9/16” Wrench,

level, Step ladder

NOTE: If you have f.A. flag angles, complete this step.
To install horizontal track, place the curved end over the top roller of the top section. Align the

bottom of the horizontal track with the top of the vertical track. Tighten the horizontal track to

the flag angle with (2) 1/4”-20 x 9/16” track bolts and (2) 1/4”-20 flange hex nuts.

WARNING

WARNING

DO NOT RAIsE DOOR uNTIL hORIzONTAL TRACks ARE sECuRED AT REAR,

As OuTLINED IN sTEP, REAR suPPORT, OR DOOR COuLD fALL fROM OvER-

hEAD POsITION CAusING sEvERE OR fATAL INjuRy.

Level the horizontal track assembly and bolt the horizontal angle to the first encountered slot

in the flag angle using (1) 3/8”-16 x 3/4” truss head bolt and (1) 3/8”-16 hex nut. Repeat for

other side.
Remove the nail that was temporarily holding the top section in place, installed in step, Top

Section.
IMPORTANT: fAILuRE TO REMOVE nAIL BEfORE ATTEMPTInG TO RAISE DOOR COuLD

CAuSE PERMAnEnT DAMAGE TO TOP SECTIOn.
NOTE: If an idrive

®

opener will be installed, position horizontal tracks slightly above level.

Flag angle

1/4”-20 x 9/16”

Track bolts

1/4”-20

Flange hex nuts

Horizontal

track

3/8”-16

Hex nut

Horizontal

angle

3/8”-16 x 3/4”

Truss head bolt

Adjusting Top Brackets

13

Tools: 7/16” Wrench, Step ladder

With horizontal tracks installed, you can now adjust the top brackets. Vertically align the top

section of the door with the lower sections. Once aligned, position the top bracket slide out

against the horizontal track. Maintaining the slide’s position, tighten the 5/16”-18 hex nut to

secure the top bracket slide to the top bracket base.

Top bracket slide

5/16”-18

Hex nut

Horizontal track

Roller

Top section

End Bearing Brackets

14

Tools: Step ladder, Power drill, Ratchet wrench, 7/16” Socket driver,

9/16” Socket, 9/16” Wrench

IMPORTANT: RIGHT AnD LEfT HAnD IS ALWAYS DETERMInED fROM InSIDE THE BuILDInG

LOOKInG OuT.

NOTE: End brackets are right and left hand.
Attach the left hand end bearing bracket through either the end bearing bracket’s upper or

lower slots to the left hand horizontal angle using (2) 3/8”-16 x 3/4” truss head bolts and (2)

3/8”-16 nuts.
IMPORTANT: THE EnD BEARInG BRACKET’S LOWER SLOTS ARE uSED On DOORS WITH

12” RADIuS TRACK; THE uPPER SLOTS ARE uSED On DOORS WITH 15” RADIuS TRACK.
Secure the end bearing bracket to the jamb with (3) 5/16” x 1-5/8” lag screws. Repeat for

other side.

(2) 3/8”-16

Hex nuts

(2) 3/8”-16 x 3/4”

Truss head bolts

Left end bracket

Upper slot
Lower slots

Horizontal angle

(3) 5/16” x 1-5/8”

Lag screws

Center Bearing Bracket

15

Tools: Step ladder, Power drill, 7/16” Socket driver, 1/4” Torx bit, Level,

Tape measure, Pencil

Locate the center of the door. Mark a vertical pencil line on the mounting surface above

the door, at the center. Measure from the center of the bearing, in one of the end bearing

brackets, downwards, to the top the door. using that measurement, measure that distance

upwards from the top of the door to the mounting surface, and mark a horizontal pencil line

which intersects the vertical pencil line. Align the edge of the center bearing bracket with

the vertical pencil line and the center of the bearing in the center bearing bracket with the

horizontal pencil line; this is to ensure the torsion tube is level between the center and end

bearing brackets.
Attach the center bearing bracket to the mounting surface, using (2) 5/16” x 1-5/8” lag

screws and (1) 5/16” x 2” tamper-resistant lag screw.
IMPORTANT: uSe A 5/16” x 1-5/8” TAMPeR-ReSiSTAnT LAg ScReW inSTeAD of THe

5/16” x 2” TAMPER-RESISTAnT LAG SCREW If MOunTInG SuRfACE IS MOunTED OVER

MASOnRY. TAMPER-RESISTAnT LAG SCREW MuST BE ATTACHED THROuGH THE BOTTOM

HOLE Of THE CEnTER BEARInG BRACKET.

Center bearing

bracket

Vertical line

Mounting surface

Equal distance (top of door section to horizontal line)

Horizontal line

Center of end

bearing bracket

9